Dam Building

Weatherall Dock & Dredge Inc. completed this dam that connected two rivers with a road allowance in between. The dam was engineered, formed and cast in place, and then had a concrete facade placed on top for the final finished appearance.

Weatherall Dock & Dredge Inc. completed this dam that connected two rivers with a road allowance in between. The dam was engineered, formed and cast in place, and then had a concrete facade placed on top for the final finished appearance.

This photo above shows the finished dam. The area has been filled with water and the customer can use the dam area as a seating area.