Dam Building



Weatherall Dock & Dredge Inc. completed this dam that connected two rivers with a road allowance in between. The dam was engineered, formed and cast in place, and then had a concrete facade placed on top for the final finished appearance.
This photo shows the above finished dam,
now the area is filled with water and customer
uses the dam area as a seating area.